New vessels for GAZOCEAN by 2027

16.05.2023

GAZOCEAN is pleased to announce its Shareholder and Owner NYK has signed long-term charter contracts for four new liquefied natural gas (LNG) carriers with EnBW Energie Baden-Wuerttemberg AG (hereafter EnBW), a major German energy company.
 
These 4 vessels will be built at HD Hyundai Heavy Industries Co. Ltd. in South Korea and will be completed in sequence during 2027.
 
The 174,000 cubic meter capacity membrane-type tanks will be made of advanced insulating materials that reduce the vaporization rate.
 
They will be propelled by fuel efficient dual-fuel slow-speed two-stroke marine engines. They will also feature a shaft generator and air lubrication system (ALS) to reduce the resistance between ship’s hull and seawater, making the ships more environmentally-friendly than conventional LNG carriers.
 
The four vessels will be French flagged and fully ship managed by GAZOCEAN in Marseille.
 
Outline of Vessels
Length overall: about 289.9 meters
Breadth: about 46.1 meters
Main engine: Dual-fuel low-speed two-stroke marine engine
Cargo tank capacity: about 174,000 cubic meters
Shipbuilder: HD Hyundai Heavy Industries Co. Ltd. (South Korea)
Delivery year: 2027
Flag: France (FIR)